Wednesday: Half-day, 7:45 am - Noon
The Mid-Week Volunteer Shuffle resulted in new work groups. Readjusting to a new work partner in the middle of a project can be challenging. Sometimes struggles are exactly what we need in life. Frustration levels are high for many reasons.
It appears there has been an attempted break-in into the homeowner’s shed that now houses the washer, dryer and hot water heater. The locks held. No one got in, nothing was stolen. Still, perplexing and heartbreaking, the violation is personal to us. Anger leads to inspiration, and a renewed determination to repair this house not only to livable conditions, but into a home.
Progress report:
Outside scrubbing was finished
Calking was completed
Dryer vent and dryer installed
Newly installed hot water heater leak repaired
Handicap railing started
Trim work, front door painted
First coat of grout sealer applied to bathroom shower and floor
Fans and air conditioning were installed by a local electrician
Tiling plan for kitchen
We know we're only scheduled to work a half day today. There’s still so much to do, it’s tempting to keep going.
But, the way we spend the other half of our day will be equally important.
Posted by jaselin at December 2, 2008 08:07 PM