Job Data

Job Assignments for the Powell St home:

Hang remaining cabinets
Install ceramic tile kitchen counter tops
Install microwave oven (custom kitchen deliver-ay-ay-ay)
Install remaining trim throughout home - about 50 lineal feet
Wash the exterior and interior of the home
Caulk the entire house - inside and out
Repair the bathroom toilet tank assembly
Seal tile grout throughout the house
Install ceramic tile counter top in bathroom
Install bathroom sink and plumbing
Install kitchen sink and plumbing
Install the hot water tank
Install the washer and dryer; dryer vent to outside
Clean and organize garage area
Build rail onto existing wheelchair ramp
Patch walls damaged during previous work projects - not uncommon as the home progresses
Second coat of paint on all molding and doors, all ceilings and walls
Clean up of lot debris
Clean up of gardens and replanting as time and budget allows
Install new mailbox
And something new for a GITC team – Staging!